Method Statement For Installation & Testing Of Lightening Protection System. Ensure only trained persons shall operate the power tools. Ensure all concerned personals shall use PPE (Personal Protective Equipment) and all other safety items as required. Ensure adequate lighting is provided in the working area at all time. Ensure service area/work area openings are provided with barricade, warning tape, and safety nets where applicable. Check all material delivered to site is inspected properly by QA/QC Engineer and check if it is stored properly as per manufacturer. The electrical engineer shall check all the lightening protection system installations are as per the installation check list. CLICK HERE TO DOWNLOAD LIGHTNING PROTECTION SYSTEM TESTING & COMMISSIONING MSTRequired Tools. NO. DESCRIPTION1. Hacksaw Frame and Blade. Ladder. 3Sprit Level. Electrical earthing System. A complete method statement covering the installation. Method Statement For Installation Of Galvanized Conduits On Exposed Surface, Method Statement For Installation Of Galvanized. Method Statement For Installation. METHOD STATEMENT LIGHTNING PROTECTION SYSTEM. This Method Statement covers the installation of Lightning Protection System. Sand Paper and Files. Measuring tape. 6Meggar for earth testing. Spanners. 8Hammer. Screw driver. 10. Exothermic welding tool kit. Complete tape network shall be bonded to all down conductors around the periphery and a branch conductor to be taken horizontally and all these down conductors to be bonded by using approved clamps. Number of down conductors shall be based on the technical calculation or shop drawings. When different metal to be connected a bimetallic clamp shall be used. Any roof (e. g. 1. The electrical continuity of the reinforcing bars shall be determined by electrical testing between the uppermost part and the ground level. The overall electrical resistance should not be greater than 0. If this value is not achieved, or it is not practical to conduct such testing, the reinforcing bar shall not be used as a natural down conductor. Bond each copper down conductor throughout its length to the building reinforcement bar with spacing not more than 1. All bonding to reinforcement bar shall be by using manufacturer. Compression type connectors may be used where approved by the consultant. Method Statement For Installation Of Cable Tray Or Trunking; Method Statement For Installation Of Cable Tray Or Trunking System For. This method statement is. Method Statement for The Installation of Electrical Services. Tags: method statement for electrical installation. Electrical Works’ Method Statements. Method statement for installation of earthing system; Method statement for installation of electrical identification. Earthing electrical equipment safe work method statement. Design, construction and installation. OHS Management system Earthing and Electrical Grounding Installation. Method Statement For Installation Of Earthing System.pdf. Method Statement For Installation Of Earthing. The earthing shall be done as per local authorities requirements. A minimum of 2. 40. Wherever the soil resistivity is low (typically below < 2. With the test clamp disconnected, the resistance of each individual earth should be no more than ten times the number of down conductors in the complete system. The terminated head of each electrode shall be located in a light weight inspection pit. If clear earth is not available, then the Specialist Lightning Protection Installer has to install the earth pit inside the building using double flange earth electrode seals. Test clamps shall be provided in each inspection pit to allow for testing and commissioning. Concrete inspection pits with cover shall be installed flush with finished floor level and be fully accessible. All metallic parts protruding outside the extended air termination network (e. This air terminal shall be installed at a suitable separation distance so that the partial lightning current doesn. The cable from the equipment shall be protected using an over . Necessary remedial action needs to be taken to reduce the value below or equal to 1. Sharing is Caring - Spread the Knowledge.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
December 2016
Categories |